Drawing Inbox

A drawing register template for Excel

Laid out the way a steel fabricator's office keeps one. Download it and use it; the notes below say what each column is for and where a register kept by hand goes wrong.

Download the template (.xlsx)

One sheet, nine columns, a worked first line, thirty empty rows, a frozen header with a filter. Opens in Excel, Numbers and LibreOffice. No sign-up.

The columns

ColumnWhat goes in it
Drawing numberThe number on the title block, exactly as printed: 7173-09, GA-05, 001. The number is the drawing's identity; a new revision keeps it, a new drawing gets a new one.
TitleWhat the sheet shows: GA elevations, stair C sections, base plate details.
RevThe revision on the title block. P01, P02 for preliminary; C01, C02 for construction; some offices use letters. Whatever the office uses, write it the same way every time.
StatusCurrent or Superseded. Only one revision of a number is ever current.
Date issuedThe day it went out, not the day it was drawn.
Issued toWho received it: site, client, engineer, painter. If a revision went to one and not another, that is the fact you will need in six months.
FormatPDF, DWG, DXF, IFC. A sheet usually travels as a PDF with its DWG beside it; the model is one IFC for the whole issue.
Superseded byOn the old row, the revision that replaced it. This is the column that answers "which one is right?" at a glance.
NotesWhy it changed, who asked, anything the next person needs.

How to keep it

Where a register kept by hand goes wrong

The register is only right if somebody typed the row before the phone rang. The usual failures are the same in every office: the revision went out and the row was never added; two people kept two copies and they disagree; the old PDF stayed in the site WhatsApp group beside the new one and the gang opened the wrong one; and when a question came a year later, nobody could say which sheet was current on the day.

None of that is carelessness. It is what happens when the register and the drawings are two separate things that a person has to keep in step.

Or let the register keep itself. Drawing Inbox is the office's box for approved drawings: drop the PDF, DWG and IFC in, and it reads the title block, files each sheet under its number, marks the old revision superseded and stamps it, and keeps the site team's phones on the current set. The register above is what it exports, filled in. £49 a month per company, plus VAT, no per-user seats.

See it working on real drawings · Drawing revision control on site: a short guide

Drawing Inbox is made by M&R Tekla Detailing Limited, a steel detailing office in Okehampton, Devon. Questions: hello@drawinginbox.com.